k63a3Athletic Facility Constructability Studies |
This study examines the juncture of three exterior wall types in the days before BIM and digital modeling was considered practical. The sketch served to verify construction drawing details with the senior architectural designer in the office, and later the design team. The drawing was prepared in an hour. This type of study illustrates the natural alignment of my thought processes to my current line of work, construction visualization. Produced 27 May 2000 = Tayya 63a3, six dozen third phase (Añikç-Epravinal Xrga, “Househunting Life Phase”).
This page last modified Saturday 14 April 2012.