custom temporary structures

Vinci · Behind the Scenes | Custom Temporary Structures

Vinci’s client required a custom structure in order to portray construction activity at the pump station worksite. Vinci LLC worked closely with its client’s consultant to produce a plausible headframe for this work. In the end, a smaller frame was used. Vinci LLC can rapidly assemble structural steel frames; this headframe was built in 4 hours, and revised in 2½. Check out the headframe → used in the actual visualization.

This page last modified Thursday 26 May 2011.