General 4d Construction Worksite Overview

Vinci General Construction Sequence™ | General 4d Worksite Overview | Introduction and Closing Sequence

Vinci General Construction Sequences™ can be used to summarize all worksite activity throughout a schedule. In this instance, much of the work took place in three concentrated locations, thus the GCS™ view was used merely to introduce sitewide mobilization and close the presentation of site logistics with a wide shot. Click here to view the dock side of the facility.