4d virtual construction facility type study

Vinci LLC | 4d Construction Vignette | Pressure vs. Immersion Membrane Studies.

Pop the hood and gaze at the "engine" that is the Owner's dream. Vinci can weave RFP drawing information, a narrated description, a brief interview with your experts, pictures of similar installations, and Vinci's own rapid modeling techniques to arrive at a convincing portrayal of the Owner's proposed facility. This is a key distinguishing message on some bids. The goal is to get past schematics so we can talk construction strategy.

Check out cross sections of the facilities or a study of structures to the left of this facility.

This page last modified Saturday 21 November 2015.