Vinci AA100Museum Master Plan Expansion |
We can all get along! This vignette shows a temporary crosswalk once the new garage is finished, and the continuing service lane operation at the same time. It is meant to foster some discussion, merely indicating the contractor-client is aware of the Owner’s intent. Then we show the final configuration when the temporary entrance downgrades into a fire exit, and the former museum entry becomes a garden.
This page last modified Thursday 14 March 2019.