Vinci A8A25Ivy University Academic Expansion |
Vinci LLC’s construction worksite vignettes help your team describe major aspects of your worksite strategy. This 4d worksite detail illustrates the changes that mobilization brings to the pedestrian walkways. The main site entry gate, temporary construction road, field office, crane location, even a temporary hoist access path across the roof appear in this view.
Take a look at the worksite exit, ride down the temporary construction road, drive left or right down the main road, or view the entire worksite from above. Check out a view of the path to the temporary hoist.
This page last modified Monday 28 October 2013.