Vinci A8A25Ivy University Academic Expansion |
Good construction visualization acknowledges existing, proposed, and temporary conditions. The existing conditions represent the context of the project, surrounding it and running under it. These conditions are especially relevent when construction engages them, as in an addition, regrading, or for work on a campus or community. Proposed conditions are the subject of the project; we are building a building, after all.
Temporary conditions comprise much of what a builder would consider logistics. We can put together a cogent workflow and schedule simulation by just applying 4d to a building information model. Many BIMs have some rendition of context. What really sets Vinci’s clear and convincing construction visualization apart from many other services is its attention to temporary conditions. These conditions mate with existing and proposed conditions. This image is an excellent illustration of the connection between the three conditions. No construction illustration is complete if it doesn’t acknowledge all three conditions. This is Vinci LLC’s philosophy, and it is one of the things that makes for convincing construction visualization.
Take a look at the hoist accessway in the context of the full schedule, see the worksite overview, or take a look at the delivery truck's viewpoint.
This page last modified Tuesday 29 October 2013.