Vinci A9158New Campus Building & Parking |
This segment of the general worksite overview focuses on enabling work. This project features two intercalated phases; the first phase involves stripping and milling asphalt from one lot, then using the reclaimed asphalt in the reconfigured parking lots. The second phase begins as the parking lot phase is underway. This phase sees the construction of a steel frame performing arts center at center right. This view ignores a remote parking lot to concentrate on the lot at left, the adjacent lot in back, and the building construction. The white-roofed maintenance building at the center must remain open. This visual illustrates how the contractor intends to guarantee access to the building throughout the construction schedule.
Take a look at the full general worksite overview, or the remote lot or building construction segments of the full animation. Visit close up views of the remote lot, the intermediate lot, demolitions, or the adjacent lot. See a close up view of building construction from the front or the back. Take a closer look at traffic channelization. Take a look at simulations of views from the perspective of vehicular or pedestrian traffic.
This page last modified Tuesday 22 October 2013.