Vinci A9B59Greenfield Assisted Living Facility |
Show your audience how you’ll put together their dreams with a Vinci Detail Construction Sequence™. These take in key activity on a significant portion of the worksite for most or all of the construction schedule. This building has reinforced masonry walls and precast concrete planks. The roof has a light gauge steel frame that masks rooftop equipment. All of this is easy for anyone in your audience to see for themselves—that is the power of Vinci’s work: we clarify your construction message. Vinci works with schematics in the RFP and your team’s directives to arrive at convincing construction visualization before show day.
Take a look at the whole site, site logistics features, or sitework features.
This page last modified Monday 11 September 2017.