LOCATION:
Midwest USA

YEAR PRODUCED:
2009 Q4

CONST. VALUE:
3 •••

CONST. SCOPE:
1

VINCI PROJECT LEVEL:
2 ••

DEVELOPMENT TIME (DAYS):
9 •··

SURGE INTENSITY (%):
0%

FEATURES
Vinci Digital Worksite™
Vinci GCS™
Vinci DCS™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Raisin’ the Roof

A set of illustrations of the concept of structural extension vs. structural replacement at an industrial kitchen in the Midwest. The resultant imagery compares the extension vs. replacement options, reviews the extension option schedule, and uses three cross-sections (Examples: 1 →, 2 →, 3 →) to further study the extension option. The imagery was produced both in print and screen versions to cover both the proposal booklet and interview presentation, respectively.

4d General Overviews

4d Construction Details

4d Construction Vignette

g83b2-00 g83b2-10 g83b2-12

GCS™ | Structural Expansion Overview

4d Summary of structural extension concept

DCS™ | Lengthwise (Longitudinal) Section at Expansion

4d Section through existing sawtooth portion of existing building

Vignette™ | Lengthwise (Longitudinal) Expansion Section Detail

Detail showing insertion of new structure and removal of old

g83b2-01 g83b2-11

GCS™ | Structural Expansion Analytics

4d Summary of structural extension concept

DCS™ | Crosswise (Transverse) Section at Expansion

4d section across existing building and expansion

This page last modified Saturday 21 May 2011.