Vinci G83B2Industrial Expansion |
Tweet |
LOCATION:
Midwest USA
YEAR PRODUCED:
2009 Q4
CONST. VALUE: ⇒
3 •••
CONST. SCOPE: ⇒
1 •
VINCI PROJECT LEVEL: ⇒
2 ••
DEVELOPMENT TIME (DAYS): ⇒
9 •··
SURGE INTENSITY (%): ⇒
0% —
FEATURES
Vinci Digital Worksite™
Vinci GCS™
Vinci DCS™
Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.
A set of illustrations of the concept of structural extension vs. structural replacement at an industrial kitchen in the Midwest. The resultant imagery compares the extension vs. replacement options, reviews the extension option schedule, and uses three cross-sections (Examples: 1 →, 2 →, 3 →) to further study the extension option. The imagery was produced both in print and screen versions to cover both the proposal booklet and interview presentation, respectively.
This page last modified Saturday 21 May 2011.