k63a8 bAthletic Facility Constructability Studies |
This drawing summarizes the architectural design intent to the design team, contractor, and Owner. It is part of a graphic conversation between the architect (for whom I worked), the building team, and the Owner. Produced 1 June 2000 = Tayya 63a8, six dozen third phase (Añikç-Epravinal Xrga, “Househunting Life Phase”).
This page last modified Sunday 15 April 2012.