|
|||||
|
|||||
A7B33 | Vinci™ Immersive GCS™ | Structural Steel Phase 2 | Maintain Receiving Dock AccessThe Vinci™ Immersive Contextual Model™ furnishes a rich context for urban and tight worksites, and graphics that back up your team’s analysis & solutions. Steel is erected over the receiving dock. This is the last of four segments. Click the links above the picture or use the following: Review GCS » | Switch View (C) » | Switch View (Initial Detail) » | Next » |