A8226 | Site A | Vinci™ Digital Worksite™ | Construction Logistics Detail

A view of construction of the washwater recovery basin, residual return lift station, with a raw water flushing vault in the background. This image, part of a full sequence at this location, helps illustrate logistics and scheduling for each of the three structures, and how they interplay throughout the duration of the project. Click the links above the picture to switch between sequences on the top row, or among the images in the sequence in the bottom row, or use the following: Next Image » | Site A / River Intake »