Vinci A82A4New Water Treatment Facility |
Tweet |
The viewset begins on the lake surface. The section is introduced, and the drilling, capping, tunnel boring, excavation, and assembly of the intake unfolds. In the client presentation, this sequence was annotated, followed by an annotated detail sequence. View an annotated frame from the presentation here →
This page last modified Thursday 26 May 2011.