Vinci A82AANew Water Treatment Facility |
Tweet |
Though the administration building is perhaps not much of a challenge, showing the audience the front door of their new facility can help connect to the audience. This model was built given an early design development plan and four basic elevations.
This page last modified Thursday 29 September 2011.