LOCATION:
Mid Atlantic

YEAR PRODUCED:
2009 Q2

VINCI CLIENT: MWH
WIN

CONST. VALUE:
2 ••

CONST. SCOPE:
4 ••••

VINCI PROJECT LEVEL:
2 ••

DEVELOPMENT TIME (DAYS):
13 •······

SURGE INTENSITY (%):
47%

VINCI FEATURES
Vinci Digital Worksite™
Vinci General Construction Sequence™
Vinci VinTerra™

Click the “⇒” symbols above for more information on these terms and metrics.

Similar Projects:

a82a4
A82A4 WET INFRASTRUCTURE

a8226
A8226 WET INFRASTRUCTURE

a7b53
A7B53 WET INFRASTRUCTURE

Quick Clearwells

Vinci Digital Worksite™ illustrates a greenfield waste water treatment plant.

a82aa-00 a82aa-10 a82aa-20

GCS™ | General 4d
Worksite Overview


4d summary of all
worksite activities

GCS™ | General 4d
Worksite Overview


A plan view of all
worksite activities

DCS™ | 4d Worksite Detail

Clarifier Tanks and Secondary Clearwells

a82aa-21 a82aa-22 a82aa-23

DCS™ | 4d Worksite Detail

Front of Property under development

DCS™ | 4d Worksite Detail

Ancillary buildings along the service drive

DCS™ | 4d Worksite Detail

Gravity thickener and clarifier under construction

a82aa-24 a82aa-80 a82aa-81

DCS™ | 4d Worksite Detail

Effluent filter facility under construction

DWS™ | Convincing
Construction Visualization


Clearwells, clarifier tanks, and gravity thickener from early design develeopment drawings

DWS™ | Convincing
Construction Visualization


Ancillary buildings modeled given early design development drawings

a82aa-82 a82aa-83

DWS™ | Convincing
Construction Visualization


Project-specific detail

DWS™ | Convincing
Construction Visualization


Highlighting the administration building

a82aa-90 a82aa-91

DWS™ | Behind the Scenes

Early design development detail

DCS™ | Behind the Scenes

4d ancillary buildings from schematics, defined in around 2 hours!