Vinci A7B53Water Treatment Facility Upgrade |
Tweet |
LOCATION:
Southeast
YEAR PRODUCED:
2008 Q1
WIN
CONST. VALUE: ⇒
3 •••
CONST. SCOPE: ⇒
4 ••••
VINCI PROJECT LEVEL: ⇒
2 ••
DEVELOPMENT TIME (DAYS): ⇒
25 •••····
SURGE INTENSITY (%): ⇒
0%
VINCI FEATURES
Vinci Digital Worksite™ ⇒
Vinci General Construction Sequence™ ⇒
Vinci VinTerra™
Click the “⇒” symbols above for more information on these terms and metrics.
A8226 WET INFRASTRUCTURE
An urban water treatment plant gets an overhaul.
This page last modified Thursday 29 September 2011.