4d virtual construction cross section frost wall vs deep excavation

Vinci LLC | Construction Strategy Vignette | Frost Wall vs. Deep Excavation.

Construction strategy vignettes simply study a salient minor aspect of construction strategy. Ambiguities in the schematic RFP drawings led to this study of the implications of the depth of the proposed foundation walls. The study assumes layback, avoiding expensive temporary retaining wall measures. See the excavations in the context of all site excavations.

This page last modified Wednesday 25 September 2013.