LOCATION:
Northeast

YEAR PRODUCED:
2013 Q2

VINCI CLIENT: WMI

CONST. VALUE:
1

CONST. SCOPE:
1

VINCI PROJECT LEVEL:
••·

DEVELOPMENT TIME (DAYS):
14 ••

SURGE INTENSITY (%):
25%

VINCI FEATURES
Vinci Digital Worksite™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Dig This Gut Rehab

This is a fairly simple medical office building gut rehab project. Schematic drawings imply a locally deep excavation and open a question about the depth of excavation at the remaining perimeter. Vinci LLC used its SketchBuild™ design completion service to produce a plausible configuration for the renovation. This enables the contractor to talk about plausible construction issues at the bid interview. The virtual construction visualization consists of a general worksite overview with an auxiliary view on the back side. Some studies explore the depth of excavation, presuming layback.

Click the images on the following menu to view the examples:

a9089-00 a9089-10 a9089-20

General 4d Worksite Overview.

View of the entire worksite throughout the construction schedule.

Alternate Worksite Overview.

View of the back of the worksite showing the development of façades not visible in the main view.

Deep Excavation Study.

Exploration of the implications of a locally deep foundation, presuming layback.

a9089-30 a9089-40 a9089-70

Perimeter Excavation Study.

A study of perimeter layback excavation throughout the schedule.

Frostwall vs. Foundation Wall.

A cross section through the worksite showing layback generated by frostwalls vs. full foundation walls.

Vinci SubVision Xray™
Site Utilities


Simple view of existing underground utilities.

a9089-90 a9089-91 a9089-92

Virtual Construction Modeling:
Construction Context.


A good virtual construction model acknowledges project context.

Design Completion:
SketchBuild™ Service.


How Vinci LLC produces virtual construction models for schematic RFPs.

Design Completion:
Typical Ingredients.


What datasets does Vinci LLC employ in the production of schematic-phase virtual construction models?