Vinci A9285University Campus Ductbank |
Vinci LLC’s Digital Worksite™ service produces Detail Construction Sequences like the one above, encapsulating construction within a major segment of the project from a single view. This segment leaves the roadway to trench around existing underground utilities and terminates at a manhole in the street. This manhole is unfortunately located in front of a delivery dock, necessitating the shutdown of the dock for a brief time. A bore must be made over the manhole site before installation, then the trench proceeds to the left toward the final segment of the trench.
This page last modified Wednesday 30 July 2014.