Vinci A9285University Campus Ductbank |
Vinci LLC’s logistics vignettes take a deeper look at particular features of your construction strategy. This vignette shows installation of a roadway manhole at an academic drive exit. The cut is phased so that it closes only one end of the academic drive at a time. See this detail in context of the trench phase.