Vinci A9569Ivy Engineering School Gut Rehab |
This view helped the client verify site fence appearance, branding, signage, and discuss traffic channelization toward an operating loading area. See the 4d schedule sequence from this side of the building, construction of the planned overhang, or a related preliminary study of the temporary atrium entrance canopy. Note that the final version of this image shows the fence from the vantage point of a driver or pedestrian on the campus road.
This page last modified Thursday 25 June 2015.