Vinci A9B40Water Treatment Filter Retrofit |
Vinci’s convincing construction visualization is an ideal part of your marketing and informational construction messages. The visuals speak clearly to the audience, conveying technical process information to non-professional decisionmakers visually while your engineer or project manager narrates the process. All the essential points are covered, such as the air line (yellow) and return water line (green). The existing basin is shown at lower right and the proposed pump station appears at left. Cross sections are useful in that they portray internal vertical relationships that can’t be seen in an aerial or ground view.
Take a look at other cross sections 1→, 2→,3→, the main construction simulation, or the existing plant.
This page last modified Friday 25 August 2017.