Vinci A9B40 Example Navigator

Welcome to the example navigator! This menu accesses all ten examples deriving from Vinci Project Number A9B40. Not all examples can be accessed from the Project Overview page. Click on an image to visit an example.

a9b40-10 a9b40-20 a9b40-30 a9b40-50

DCS _PH _SD
Facility Process Detail.
Work on this project focused on a membrane facility rehab. Simple schedule sequence.

VGN _UU __X
Facility Process Detail.
Close-up and cutaway view of membrane facility rehab.

VGN _UU __X
Membrane Retrofit Detail.
Detail of membrane train. Vinci LLC can model your process mechanical quickly and convincingly so you can head to interview armed with great visuals!

VGN _UU _SD
Pump Station Detail.
A new pump station is necessary but little in the way of design guidance. Client engineer provided informal specs and Vinci produced a plausible model.

a9b40-56 a9b40-60 a9b40-64 a9b40-68

VGN _UU _SD
Vinci Construction Vignettes
Pump Station Section.

Vinci invented this plausible pump station given specs from client engineers, expediting visualization.

VGN _UU __X
Vinci Construction Vignettes
Basin Filter Section.

Transverse cross section of the pipe gallery and existing basins.

VGN _UU __X
Vinci Construction Vignettes
Gallery Section.

Longitudinal cross section of the existing pipe gallery.

VGN _UU __X
Vinci Construction Vignettes
Gallery Detail.

Detail of pipe mechanical Vinci modeled from 1989 measured drawings.

a9b40-70 a9b40-90    

DWS CAM _XX
Vinci Digital Worksite™
Existing Plant.

Simple static overview of the existing wet infrastructure plant.

VVV _UU _KK
Vinci · Behind the Scenes
Anticipate Structural Improvement.

Nearly a quarter century of experience with structures enables Vinci LLC to render plausible structures from schematics, allowing your team to focus on your construction message!

   
This page last modified Friday 18 August 2017.