Water Treatment Facility Construction Logistics Simulation

Vinci Detail Construction Sequence™ | Conversion of Pre Treatment Basins.

This retrofit required a little research and attention to detail. Once the existing condition was established, attention turns to temporary conditions. We can strike a cross section for clarity. The proposed condition matches the schematic as it ought to.

This page last modified Friday 20 April 2018.