Filter Building Layout Options.

Vinci Construction Strategy Vignette™ | General Structural Sequence.

This overview of work phasing over the rink simplifies the BIM model so that non-construction decisionmakers can get a grip on what’s being proposed. This is one of two studies, the second more detailed. Print studies can handle a lot more visual loading than screen visuals. The resolution is finer and paper is “persistent”, meaning someone can sit with it and peruse to their heart’s content. Still, the cross frames and bracing only add to an already complex image. Vinci can help you thin it out so your team can cut to the chase and clinch that job!

Take a look at a rinkside view, a detail view, or construction laydown and traffic channelization outside the rink.

This page last modified Thursday 24 August 2017.