Vinci R9119Hydraulic Fracturing Process Diagram |
This detail zooms in on the late stage of the drill rig site, now capped by an oil pump as well as a transfer station. The sites were modeled, the output placed in relation to one another in a plenary model. Model output was conditioned in a raster editor. Vinci LLC applied flexible effects like the roadways and worksite plots in the raster editor. Vinci painted 24 combinations of site trees and applied these in an affected perspective, the only inflexible portion of the raster process.
This page last modified Wednesday 23 October 2013.