LOCATION:
Northeast

YEAR PRODUCED:
2013 Q3

VINCI CLIENT: FLK
SHOW

CONST. SCOPE:
1

VINCI PROJECT LEVEL:
••·

VINCI FEATURES
Vinci Digital Worksite™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Thrillin’ with the Drillin’

Vinci LLC produced an illustration of the general industrial oil services processes associated with hydraulic fracturing. This required digitally modeling equipment on each worksite. The project proceeded in two phases. The first phase included modeling the equipment from cut sheets, photographs, and diagrams. The second phase involved placing the modeled worksites on a diagrammatic pie-shaped terrain. The sites were scaled up or down as necessary.

Click the images on the following menu to view the examples:

r9119-00   r9119-10

Final Hydraulic Fracturing
Process Illustration.

 

Early Phase Drill Rig Detail.

r9119-13 r9119-16 r9119-19

Middle Phase Drill Rig Detail.

Late Phase Pump Site Detail.

Restoration to Nature Detail.

r9119-90 r9119-91 r9119-92

Industrial Process Modeling:
Drill Rig Site.

Industrial Process Modeling:
Storage Site.

Industrial Process Modeling:
Transfer Station.

r9119-93 r9119-94 r9119-95

Industrial Process Modeling:
Drill Rig Steel Base.

Industrial Process Modeling:
Oil Pump.

Industrial Process Modeling:
Horizontal Heater Treater.

r9119-96 r9119-97  

Industrial Process Modeling:
Assorted Oil Services Vehicles.

Industrial Process Modeling:
Assorted Oil Services Tanks.

 

This page last modified Wednesday 23 October 2013.