4d virtual construction visualization existing plant

Vinci · Behind the Scenes | Existing Plant.

Basis documentation includes the RFP, any drawings, photographs, or descriptions of the work, including the existing, temporary, and proposed conditions. Vinci keenly applies select parts of the basis documentation to assemble a model of the existing condition system. Vinci LLC knows which documents are relevant to the definition of a cogent total model, and which documents can safely be ignored. This winnowing of the basis document set is key to producing a timely yet complete model of relevant existing conditions.

This page last modified Thursday 4 September 2014.