Vinci R9408Replacement Water Basins |
LOCATION:
Central USA
YEAR PRODUCED:
2014 Q3
VINCI CLIENT: MWH
WIN
CONST. VALUE: ⇒
2 ••
CONST. SCOPE: ⇒
3 •••
VINCI PROJECT LEVEL: ⇒
1½ •·
DEVELOPMENT TIME (DAYS): ⇒
6 ······
SURGE INTENSITY (%): ⇒
2%
VINCI FEATURES
Vinci Digital Worksite™ ⇒
Vinci SubVision™ Solid ⇒
Click the “⇒” symbols above for more information on these terms and metrics.
R9369 WET INFRASTRUCTURE ⇒
A7B53 WET INFRASTRUCTURE ⇒
Vinci Digital Worksite™ yields several dozen images showing the development and phasing of replacement basins at a water plant.
This page last modified Tuesday 9 September 2014.