LOCATION:
Central USA

YEAR PRODUCED:
2014 Q3

VINCI CLIENT: MWH
WIN

CONST. VALUE:
2 ••

CONST. SCOPE:
3 •••

VINCI PROJECT LEVEL:
•·

DEVELOPMENT TIME (DAYS):
6 ······

SURGE INTENSITY (%):
2%

VINCI FEATURES
Vinci Digital Worksite™
Vinci SubVision™ Solid

Click the “⇒” symbols above for more information on these terms and metrics.

Similar Projects:

r9369
R9369 WET INFRASTRUCTURE

a82aa
A82AA WET INFRASTRUCTURE

a7b53
A7B53 WET INFRASTRUCTURE

Building Big Basins

Vinci Digital Worksite™ yields several dozen images showing the development and phasing of replacement basins at a water plant.

r9408-00 r9408-26 r9408-36

GCS™ | General 4d
Worksite Overview


4d summary of all
worksite activities

DCS™ | 4d Worksite Detail

Focus on water tank construction

DCS™ | 4d Worksite Detail

Demolition of existing basins and replacement basin

r9408-40 r9408-54 r9408-91

SubVision™ Solid
Existing Underground
Utility Cluster


Use Vinci SubVision™ 4d construction details to raise important questions during your interview—ahead of the game!

SubVision™ Solid
Underground Utility
System Expansion


Some projects, the real story is underground. Tell that story with Vinci SubVision™!

Vinci · Behind the Scenes
Existing Plant

Vinci LLC strives to get that worksite right, using RFP drawings, aerial and site photography, and plain intuition, so that you and the audience can focus on your brilliant strategy!

This page last modified Tuesday 9 September 2014.