LOCATION:
SOUTHWEST USA

VINCI CLIENT: MCH

YEAR PRODUCED:
2007 Q4

CONST. VALUE:
3 •••

CONST. SCOPE:
2 ••

VINCI PROJECT LEVEL:
•·

DEVELOPMENT TIME (DAYS):
8 •·

SURGE INTENSITY (%):
26%

VINCI FEATURES
Vinci VCM™
Vinci AIP™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

r7730
A8583 PARKING,
PRECAST

r7730
A8583 PARKING,
UNDERGROUND

a8306
A8306 PARKING,
PRECAST

a7966
A7966 PARKING,
PRECAST

a7769
A7769 PARKING,
PRECAST

Healthcare Half & Half

This construction visualization project is typical of Vinci LLC’s Virtual Construction Montage™ service. Schematic drawings were used to create a digital model of the subject structure and limited logistics. Vinci LLC superimposed the model on an oblique aerial photograph. The construction fence was painted on so as not to burden the superimposition with exactly matching the ground plane in the photograph.

Vinci LLC produces montage overviews and worksite details occasionally, as most clients prefer Vinci Digital Worksites™. The typical Vinci DWS™ yields hundreds of images, including 4d overviews from multiple directions, worksite details, and analytical vignettes. However, montage overviews remain good options for certain applications. Montage is widely applied to vignettes (short studies) that may or may not be adjunct to larger projects. Montage output can be produced on a more limited budget than Vinci Digital Worksites™, however, they are more difficult to change. Your company can successfully apply the Vinci Virtual Construction Montage™ when you are sure of your construction message and most of the project can be seen from a single vantage point. Presented below are 3 examples related to Vinci Project Number A7ABA.

a7aba-00 a7aba-01 a7aba-80

Vinci VCM™ | General 4d Worksite Overview

Simple two-phase 4d worksite overview montage

Vinci VCM™
Ancillary Structure Colocation Vignette

Example of colocation options studied

Vinci AIP™
Annotated Virtual Construction Montage

Annotated example of the 4d worksite overview (names and figures have been altered)

This page last modified Friday 26 June 2015.