LOCATION:
Northeast USA

YEAR PRODUCED:
2009 Q3

SHOW

CONST. VALUE:
2 ••

CONST. SCOPE:
3 •••

VINCI PROJECT LEVEL:
3 •••

DEVELOPMENT TIME (DAYS):
20 ••······

SURGE INTENSITY (%):
47% •··

VINCI FEATURES
Vinci Digital Worksite™
Vinci SubVision Xray™
Vinci GCS™ 1→ 2→

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8517
A8517 SHOW

a84b2
A84B2 REGION

a84b2
G83B2 INDUSTRIAL, STEEL FRAME

a7910
A7910-A7940 INDUSTRIAL, STEEL FRAME

Click the images to view examples

a8337-00 View a Vinci General Construction Sequence™

a8337-10 Tilt-Up / Framing Sequence

a8337-90 Exterior Options

a8337-03 Branded site logistics!

a8337-01 Getting It Right

a8337-20 Ancillary Structure

Tilt Up Design Studies

Pass around a cold brew

A Southern Tier beverage distributor is moving their warehouse to a blighted shopping center, breathing economic activity and green space into that part of town. Vinci’s client is teamed up with a designer and is interested in showing the Owner a few exterior finish options. The client also would like to describe construction.

Distilling the work

Vinci produced a VinTerra™ digital model of the site and environs, which originally included buildings which had been demolished and needed removal. Nearby major improvements and all observed minor improvements were placed in a Digital Worksite™. Vinci produced a rapid SubVision Xray™ view of existing site utilities. The worksite was laid out according to directives. Vinci built the subject, a steel-frame structure with tilt-up concrete exterior walls, given a brief set of plans and elevations. Logistics were placed and the schedule applied to the worksite. Vinci generated views of the exterior options, a General Construction Sequence™, three detail sequences, and frames covering areas not seen in detail in the other views.

Shipping it out

The construction visualization was instrumental in helping the Owner make architectural decisions and understand the construction strategy. Vinci’s Digital Worksite™ service aims for an efficient development of clear, convincing, audience-friendly construction marketing graphics. From branded logistics to realistic laydown and staging rendering, Vinci LLC’s construction visualization has evolved to clearly communicate your construction message to your audience. Vinci Digital Worksite™ service can be affordable even for modest commercial projects, giving you an edge when it comes to communicating to an Owner or stakeholder. Call Vinci LLC today to illustrate your next construction marketing endeavor.

Note: The titles of the project are intended in no way as an endorsement of Vinci LLC nor any other entity by Seneca Beverage or Anheuser-Busch / InBev. The names appear here as they appear on the subject of a Vinci LLC convincing construction visualization effort.

This page last modified Wednesday 16 November 2011.