Vinci A8B70Campuswide Medical Center Expansion |
This animation covers the construction logistics and schedule for a medical patient tower vertical expansion. This might be a 4d general overview were it not for the surgery addition, a separate construction operation on the neighboring triangle to the left of the tower in the above picture. That construction operation interacts with the vertical expansion, making this a multiphase project. Take a look at the other phases of construction on this site: surgery addition→, MOB→, or see the temporary delivery access route.
This page last modified Tuesday 24 September 2013.