LOCATION:
Midwest

YEAR PRODUCED:
2013 Q1

VINCI CLIENT: OSH
SHOW

CONST. VALUE:
4

CONST. SCOPE:
4 ••••

VINCI PROJECT LEVEL:
•••••••·

DEVELOPMENT TIME (DAYS):
74 ♦♦••····

SURGE INTENSITY (%):
48%

VINCI FEATURES
Vinci Digital Worksite™
Vinci GCS™ 1 → 2 →

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8373
A8373 HEALTHCARE
CAMPUSWIDE WORK

a8583
A8583 HEALTHCARE
CAMPUSWIDE WORK

a8517
a8517 HEALTHCARE
LOCATION

Click the images to view examples

4d virtual construction schedule sequence View a Vinci General Construction Sequence™ (Sitewide Overview)

4d virtual construction vertical expansion patient tower View a 4d worksite detail illustrating a patient tower vertical expansion, complete with logistics.

4d virtual construction demolition surgery expansion Take a look at a 4d worksite detail focusing on the demolition and construction of a surgery expansion.

4d virtual construction MOB medical office building See a 4d worksite detail highlighting the Medical Office Building construction.

3d virtual construction logistics temporary conditions Check out how Vinci ensures it’s illustrating the client’s construction strategy using Vinci LLC’s Directive Overlay™.

4d virtual construction section healthcare demolition excavation bank retention See a cross section through the surgery addition during demolition, excavation, and construction.

3d virtual construction healthcare demolition illustration Take a look at an example of virtual demolition.

Over, Under, and Through.

Click here→ to see examples of work. Use the menus above to visit other examples!

Medical Center in Motion

A major medical center in a Midwestern city plans to expand—right above its front door! At the same time, it’s planning to build a new surgery addition—right next to the vertical expansion. A medical office building is scheduled to rise on a nearby lot. All the while, patients need care, the public needs access right where they expect to enter the hospital—at the front door. This seems to be a multiphase medical menace…or is it?

Temporary Conditions and Phasing

Vinci’s client is a construction company with a logistics plan. The plan works; they need to show it to the Owner in a way that everyone can understand. The job is divided into several phases, chalked out for each project component. The patient tower will host the laydown/staging area. A temporary protected public vehicular accessway will accommodate regular traffic to the main entrance throughout the construction schedule. A conference center will come down, a surgery addition rising in its place. An atrium nestled between the two components will need restoration. The medical office building will come together on an isolated lot, but street closures necessitate a temporary delivery access route between the MOB and surgery sites.

Clear and convincing, audience-friendly construction imagery

Vinci LLC delights in multiphase campuswide construction visualization. Vinci LLC’s 4d virtual construction model includes enough definition to tell the story in convincing detail so that user groups understand what's going on during the melee. The result is a set of clear and convincing renditions of the worksite that serve as aids to discussion of all major construction issues throughout the construction schedule. Vinci’s clear, convincing, and audience-friendly construction marketing visualizations are ideal for communicating a real estate or construction message, whether you are selling construction services or just thinking big. Be the master of your plan, call Vinci LLC today! 314-351-7456.

This page last modified Friday 1 August 2014.