Vinci A9168 Example Navigator

Welcome to the example navigator! This menu accesses all one dozen four examples deriving from Vinci Project Number A9168. Not all examples can be accessed from the Project Overview page. Click on an image to visit an example. View the 2019 summary video ⇒.

a9168-00 a9168-10 a9168-16 a9168-20

DWS GCS
4d Construction Schedule Sequence.
General virtual construction of an expansion of an academic building on an ivy campus.

DWS DCS _SX _PH
4d Virtual Worksite Detail
Alternate 4d Detail Sequence.

This 4d virtual construction visualization uses a higher vantage point and steeper angle to see details at the bottom of the pit and interface of the old and new construction.

CNV _PP _AN
CentNav Presentation
Site Logistics.

Typical annotated presentation plate showing major site logistics.

DWS DCS _LL _SX
4d Virtual Worksite Detail
Excavation Pit Access.

This view focuses on excavation pit access and its closure.

a9168-26 a9168-40 a9168-70 a9168-74

DWS DCS _LL _SX
4d Virtual Worksite Detail
Excavation & Foundation Sequence.

A virtual construction sequence highlighting bank retention and the foundation retaining wall.

DWS _LL _LO
Construction Strategy Vignette
Branded Field Office Compound.

A view of the field office compound, construction waste collection center, storage, and limited staging area.

DWS __X _SX _LL
4d Virtual Worksite Section
Central Transverse Section.

A virtual construction section through the worksite excavation, highlighting bank retention, underpinning, excavation to rock, and latter stage temporary access to atrium interior.

DWS __X _SX
4d Virtual Worksite Section
North Transverse Section.

A site section focusing on bank retention, underpinning, and excavation deep into rock. Structural steel and Vierendeel trusses are also studied.

a9168-78 a9168-80 a9168-81 a9168-82

DWS __X _SX
4d Virtual Worksite Section
Longitudinal Section.

A site section highlighting excavation to and into rock and underpinning beyond.

CSV _TC _BR _LL
Stakeholder Vignette
Traffic Channelization | Northbound.

Vehicular views of temporary traffic channelization signage and pedestrian crossing.

CSV _TC _BR _LL
Stakeholder Vignette
Traffic Channelization | Southbound.

Vehicular views of temporary traffic channelization signage, pedestrian crossing, and the construction site entrance.

UGV _TC _BR _LL
Stakeholder Vignette
Traffic Channelization | Pedestrian.

Pedestrian channelization and courtesy signage.

a9168-82 a9168-90 a9168-91 a9168-92

UGV _TC _BR _LL
Stakeholder Vignette
Bus Stop & Plaza Views.

View of worksite from nearby bus stop and plaza.

VVV _XX _CT _MM
Vinci · Behind the Scenes
Campus Context.

Attention to worksite context is paramount on a major academic campus!

VVV _LL _AN
Vinci · Behind the Scenes
Preliminary Logistics Validation.

Good virtual construction can help validate logistics strategy.

VVV _KK
Vinci · Behind the Scenes
Vierendeel Trusses.

This vignette studies the implications of large and heavy longspan steel trusses.

This page last modified Thursday 26 September 2013.