Vinci LLC
INTAKE SITE
CONSTRUCTION
WATER PLANT
CONSTRUCTION
WATER PLANT
WORKSITE
WATER PLANT
COMMUNITY VIEWS
SITE B
OVERVIEW
DETAIL
SEQUENCE
FACILITY
STUDY 1
FACILITY
STUDY 2
FACILITY
STUDY 3
Facility Study 2

A8226 | Site B | Vinci™ Digital Worksite™ | Facility Study 2

Folks generally enjoy seeing “before & after” pictures; Vinci capitalizes on this to illustrate how your construction company will transform their drawings into a working facility. This is one of three short studies which show a facility under construction, at base bid completion, and an alternate completion. Click the links above the picture to switch between sequences on the top row, or among the images in the sequence in the bottom row, or use the following: Facility Study 3 » | Site A / River Intake »