Vinci LLC
INTAKE SITE
CONSTRUCTION
WATER PLANT
CONSTRUCTION
WATER PLANT
WORKSITE
WATER PLANT
COMMUNITY VIEWS
SITE B
OVERVIEW
DETAIL
SEQUENCE
FACILITY
STUDY 1
FACILITY
STUDY 2
FACILITY
STUDY 3
Facility Study 2

A8226 | Site B | Vinci™ Digital Worksite™ | Facility Study 3

This trio of vignettes covers one of five areas of interest on the water plant site. Each of the five areas of interest were studied, showing the audience that Vinci’s client was not only familiar with the RFP, but had ideas to offer regarding efficient construction and long term operation of the facility. They came to the table with options, and won the project as a result. Click the links above the picture to switch between sequences on the top row, or among the images in the sequence in the bottom row, or use the following: Worksite Images » | Site A / River Intake »