Schematic Layout Test

Vinci SketchBuild™ | Schematic Layout Test

Roughly 75% of the way through production, Vinci LLC placed the facility model on the terrain to check placement. (On this project there were two contradictory site plans). This arrangement places the facility and hardscape according to one of the two RFP site plans.

This page last modified Saturday 26 May 2012.