Vinci A8B70Campuswide Medical Center Expansion |
This worksite detail focuses on the connection between the temporary access route to the right and the existing major receiving dock at uppper left. The medical office building site at bottom right mobilizes first, followed by the surgery addition site at top. Access to the home at right is maintained throughout construction.
This page last modified Tuesday 24 September 2013.