preconstruction site logistics change over time

Vinci · Behind the Scenes | Evolution of Preconstruction Logistics.

The Owner has a Sacred Tree no contractor may ever touch (until the tree is no longer sacred). The facilities guy says no one can block a loopy drive (until they find another way to receive deliveries). The city says no entry from the main drag (until they decide it’s A-OK). We’ve all been there, basing decisions on assumptions or on a thought that changes midstream. Vinci’s Digital Worksite™ is rugged enough in most cases to easily handle that change. So change away! (Or don’t). Of course things run better when we arrange everything to minimize change. (But you already knew that!)

Take a look at the preconstruction visualization. Visit temporary worksite features: gates, security fence, trailers, protected egress, pit access, buckhoist, slip forms, roof protection.