Vinci AA0B4Water Works Upgrade |
This view represents activity pertinent to a single phase and zone of the plant. Excavation, staging, laydown, hoisting, masonry work, longspan steel, and finishes are shown either to plan, or according to general practice. The finishes, if not explicitly shown by elevation, are made to match prevailing surroundings. Vinci LLC completes the schematic design so that your team can talk construction. Check out concrete or process mechanical. See the plantwide construction logistics plan.
This page last modified Friday 20 April 2018.