Vinci AA0B4Water Works Upgrade |
The concept of the “general construction sequence” or 4d plantwide construction logistics plan aims to portray all major building activity across the entire worksite for the duration of the construction schedule. Show roving construction on multiple phases, pop the hood on the engine, or reveal what lies hidden from evident view. This view is the capstone that brings all construction operations on site under one umbrella, an excellent introduction or summary of every major thing your team describes about worksite logistics.
See phases: 1→ 2→ 3→, check out excavation, concrete, process mechanical, and exterior completion on a phase, show what’s underground, or look at a cross section of a phase.
This page last modified Friday 20 April 2018.