Vinci B9828New Elementary School |
A 4d construction worksite detail focuses on a significant portion of the construction worksite for much or all of the schedule. This worksite detail takes in the foundations, structural steel and composite deck, backup wall, masonry, roof, and sitework across the schedule of a new elementary school.
Take a look at a 4d view of the entire site, site logistics, or an overlay of the Owner’s schematic interior block diagram.
This page last modified Friday 29 March 2019.