This alternate General Construction Sequence shows construction across the entire worksite throughout the schedule in a single view. The main overview can be generated to emphasize facility construction: this one puts the stockpile and phase 1 construction up front. Take a look at phase 1 or phase 2. Take a peek underground, see the underground phasing. Take a look at how the stockpile will look from the foreground street during construction. Look behind the scenes at how Vinci LLC defines an existing plant.