LOCATION:
Northeast USA

YEAR PRODUCED:
2009 Q1

CONST. VALUE:
2 ••

CONST. SCOPE:
3 •••

VINCI PROJECT LEVEL:
5 •••••

DEVELOPMENT TIME (DAYS):
32 ••••·····

SURGE INTENSITY (%):
23%

VINCI FEATURES
Vinci Digital Worksite™
Vinci VinTerra™
Vinci SubVision Solid™
Vinci GCS™

Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.

Similar Projects:

a8723
A8723 EDUCATION, REGION

a84b2
A84B2 EDUCATION, REGION

a80b0
A80B0 EDUCATION, REGION

Click the images or the arrow links to view examples

a8235-00 View a Vinci General Construction Sequence™

a8235-11 Enclosure Sequences

a8235-80 SubVision Views

a8235-30 The Challenge!

a8235-50 Site logistics

a8235-70 User Group Experience

a8235-90 Analytical Views

a8235-98 Vinci Behind the Scenes: Context

View the legacy web pages!

Neo-Gothic Academia

Hills, utilities, and style

An expanding college is considering building a new LEED-certified academic building on its campus. The building will feature a collegiate Gothic architecture that respects the established style of the campus. This college is set upon rolling hills southeast of a small metropolitan area. Facilities date back to the early twentieth century, complete with steam tunnels and multistory masonry buildings. We have two weeks before the interview.

4d construction from schematic boxes

Vinci’s perceptive client knows about the underground utilities; sure they’re marked on plans, but evidence can also be seen just by walking around the site. The directives include visualizing underground utilities and handling the terrain in a 4d construction illustration. Vinci begins with the terrain, drawing from a survey, building a VinTerra™ high resolution digital terrain model upfront. Major and minor contextual improvements are built and placed on site, surrounding the location of the proposed building. Vinci extracts underground information from basis documentation, building a digital model of known underground conditions. The Owner has furnished space planning documents and some renderings are available as part of the basis documentation and as publicized online. Vinci draws upon Mike De Vlieger’s architectural experience at a collegiate-Gothic architecture firm and produces a plausible foundation, structural frame, and masonry enclosure given only colored schematic boxes on a plan and the renderings. Now we can show the audience how Vinci’s client plans to build.

Vinci and its client collaborate, examining the worksite, with underground tie-ins to a utility tunnel and a neighboring building. Vinci’s Digital Worksite™ service helps the client validate strategy. The worksite logistics are rendered and the impact on campus circulation is described through a series of Vinci Vignettes™.

An example of complex 4d marketing illustration

Construction marketing visualization cannot guarantee a win; factors including the consideration of qualified local bidders, social connections, and others contribute to an Owner’s decision. Visualization can help you make your case. This project is a good example of how to illustrate construction interaction with the landscape, underground utilities, user groups, and style.

This page last modified Wednesday 16 November 2011.