LOCATION:
Southern California
YEAR PRODUCED:
2013 Q4
VINCI CLIENT: MCL ⇒
CONST. VALUE: ⇒
4 ••••
CONST. SCOPE: ⇒
5 •••••
VINCI PROJECT LEVEL: ⇒
4¾ ••••·
DEVELOPMENT TIME (DAYS): ⇒
18 ••····
SURGE INTENSITY (%): ⇒
64%
VINCI FEATURES
Vinci Digital Worksite™ ⇒
Click the “⇒” symbols above for more information on these terms and metrics. Click the “→” symbols for examples.
Similar Projects:

A9194 EDUCATION
LOCATION ⇒

A8B70 HEALTHCARE
CAMPUSWIDE ⇒

A8948 EDUCATION
MASTER PLAN ⇒
Visualizing a Vivacious Village.
A west coast university wants to build a precast version of the Tuscan city of Siena for its student village. Essentially they are building a new residential campus, and have furnished schematic design documents. Vinci LLC’s SketchBuild™ schematic completion service helps the client illustrate their construction strategy to the Owner.
Click the images on the following menu to view the examples:
 |
 |
 |
4d Worksite Overview.
A view of construction activity across the construction schedule. |
Comprehensive 4d Construction Worksite Detail.
A view closer in that takes in construction of the campus buildings. |
4d Construction Worksite Detail.
Detail of the construction of a landmark mixed use building and a residence hall above retail. |
 |
 |
 |
4d Construction Worksite Detail. -
Detail of the build-out of two campus residential buildings above retail. |
4d Construction Worksite Detail. -
Alternate view of the construction of two campus residential buildings above retail. |
Limited 4d Construction Worksite Detail.
Worksite detail showing the construction of a parking deck with mixed-use space above. |
 |
 |
 |
Logistics Plan.
A bird’s eye view of the central square, used as logistics staging then later developed into a major campus feature. |
Logistics Summary.
Several views showing field offices, laydown and staging areas, and crane travel paths. |
Crawlers and Hoists.
Location of crawler cranes and temporary elevators during construction. |
 |
 |
 |
Temporary Elevator.
View showing a nonstandard hoist location serving two structures at once. |
Crane and hoisting station.
Location of hoisting implements alongside a large campus building. |
Roadside Cranes.
View showing a mobile crane in place on the street side of campus buildings. |
 |
 |
|
Vinci · Behind the Scenes Schematic Completion.
Vinci LLC excels at completing the incomplete thoughts of the design team so you can talk construction. |
Vinci · Behind the Scenes Precast Detailing.
Loaves and fishes: A pair of schematic details furnished cladding for the entire campus! |
|
This page last modified Monday 28 July 2014.