|
||||||||||
|
||||||||||
A80A4 | Vinci™ DWS™ | Phase 1 | Main ViewThis image from the Vinci™ General Construction Sequence™ illustrates the first phase of construction with major hoisting and a laydown yard on a tight hilly site along an environmentally-sensitive creek. Click the links above the picture to switch between sequences on the top row, or among the images in the sequence in the bottom row, or use the following: Second Segment of Main GCS™ » |