Vinci LLC
GENERAL CONSTRUCTION
SEQUENCE
DEMOLITION DETAIL SELECT STILL IMAGES
00 A0 A1 A2 A3 A4 A5 X1 X2
Phase II GCS

A80A4 | Vinci™ DWS™ | Future Phase | Main View

An image of a Future Phase which adds more research space, as conveyed by the RFP schematics. Pushing visualization into the future demonstrates the forethought of the contractor; even the audience’s future plans are taken into consideration on the job at hand. Click the links above the picture to switch between sequences on the top row, or among the images in the sequence in the bottom row, or use the following: Last Segment of Main GCS™ »