Vinci LLC
GENERAL CONSTRUCTION
SEQUENCE
DEMOLITION DETAIL SELECT STILL IMAGES
00 A0 A1 A2 A3 A4 A5 X1 X2
Phase 2 Southwest

A80A4 | Vinci™ DWS™ | Demolition | Southwest View

A view of the Future Phase construction, showing a concurrent and unrelated addition underway to the left, field offices in the foreground, and major logistics at the tower under construction. Click the links above the picture to switch between sequences on the top row, or among the images in the sequence in the bottom row, or use the following: Southwest Demolition Sequence » | Phase 2 GCS™ »