Vinci G9932-A9949University Athletic Center Rehab |
This 4d worksite detail shows full excavation post-demolition, foundations installed, and steel frame coming up. Perimeter safety, crane location, and existing construction are also visible.
sSee the full worksite, steel frame, channelization, existing site utilities, or the new sewer. Go behind the scenes to see how Vinci models structural framing from your team’s plans.
This page last modified Tuesday 12 September 2017.